Acetylene yield per kg of carbide falls for six main reasons, roughly by size: storage, which can cost 20–40 % in 2 days in an open drum; the wrong carbide grade, worth up to 13 %; acetylene leaving in the sludge, about 1 %; leaks; a flooded purifier; and generator faults. Compute yield every shift.
- Grade spread
- About 13 % between 25
- Open-drum loss
- 20
- Sludge loss
- Dissolved acetylene in sludge is 1 % of the make at 60 °C and 0.5
- Gasholder loss
- About 0.007 % of the make from a wet gasholder
- IS 8471 recovery
- Recovery of acetylene shall not be less than 90 % of the yield rate of the carbide used
A falling yield per kilogram of carbide is the earliest warning an acetylene plant gives. It moves weeks before any alarm trips, which is why the KIGL shift log computes it every shift. When it moves, operators usually look at the generator first. The numbers say they should look at the carbide first: the difference between coarse and fine grades on KIGL's schedule is about 13 %, two days in an open drum can cost 20–40 %, and those two together outweigh every loss inside a well-run plant. This page ranks the causes by size and gives the check for each.
The loss ledger
| Loss path | Typical size | Source |
|---|---|---|
| Carbide left open, 7–25 mm, two days | 20–40 % of gas capacity | Henszelmann (1958), as compiled by S. A. Miller (1965) |
| Grade: 25–50 mm versus 4–7 mm carbide | About 13 % (300 vs 260 l/kg) | KIGL schedule; BS 642:1931 and 1960s proposals |
| Furnace to despatch, at the producer | 2–3 % | as compiled by S. A. Miller (1965) |
| Dissolved acetylene in sludge, generator at 60 °C | About 1 % of the make | Hölemann et al. (1959), as compiled by S. A. Miller (1965) |
| Dissolved acetylene in sludge, generator at 75 °C | 0.5–0.6 % of the make | Hölemann et al. (1959), as compiled by S. A. Miller (1965) |
| Wet gasholder | About 0.007 % of the make | Hölemann, Hasselmann and Strootman (1959), as compiled by S. A. Miller (1965) |
| Leaks, purifier flooding, generator faults | Variable; can be large | KIGL plant operation manual |
Set side by side, the figures show that storage and grading dominate: inside a well-run plant, the 13 % grading spread is worth more than every in-plant loss path combined. IS 8471:2003 cl 5.2 sets the generator's own target, that recovery of acetylene shall be not less than 90 % of the yield rate of the carbide used. A plant achieving 90 % on good carbide and 90 % on poor carbide is a good plant both times; the yield per kg will still differ by as much as the carbide does.
1. The carbide grade changed
Yield falls with lump size because fines have already partly hydrated and are easily coated with deposits that interfere with the first free access of water. Measurements on one Russian lot (Strizhevskii, Zaitseva and Shelechnik, 1951, as compiled by S. A. Miller, 1965) gave 233, 247, 251, 258 and 268 l/kg across 2–8, 8–15, 15–25, 25–50 and 50–80 mm, a 15 % fine-to-coarse spread measured against the finest grade. KIGL's 260 to 300 l/kg schedule gives 15.4 % on the same basis, which is the same 13 % used above when expressed against the 300 l/kg figure. The standard schedules are set out in carbide grades, sizes and gas yield.
Check: compare the graded size on the drums with the previous lot. A delivery labelled 4–25 mm that is mostly at the bottom of the range will yield like 4–7 mm. Sieve a sample to IS 1040 if the fall is persistent; the method is under carbide quality tests. Ask also whether the dust content changed: dust has the lowest yield of all and foams in the generator.
2. The carbide got wet
Carbide reacts with atmospheric humidity. Two days in an open container cost 7–25 mm carbide 20–40 % of its gas in the measurements compiled by S. A. Miller (1965), ten times the loss across the producer's whole process. The headspace of a closed drum without a CO₂ blanket can reach 26 % acetylene (Van Ness, USP 2,899,052, 1959), so a drum that has hissed on opening has already given some of its gas to the store. See carbide storage.
Check: how many drums were opened at the start of the shift, how long they stood, whether any part-drums were carried over, whether the store has a leaking roof or a water pipe through it, and whether the monsoon has started. A fall that tracks the weather is a storage problem. Look also at the carbide as it is charged: a white powdery coating on the lumps is lime, and every gram of it is gas already lost.
3. Gas leaving with the sludge
Acetylene dissolves in the lime slurry essentially as in water, 0.685 g per litre at 60 °C and 0.438 g per litre at 80 °C, and leaves with every litre of slurry discharged. At 60 °C this is about 1 % of the plant's make; at 75 °C it is 0.5–0.6 %. A generator run cool, or run with excess water so that it never warms up, loses more. EIGA Doc 237 gives the reaction-water temperature for maximum yield as 70–80 °C and a water-to-carbide ratio of about 8:1 within a range of 7:1 to 10:1; KIGL's own band is 6–8 litres per kg, discussed under water-to-carbide ratio.
Aftergeneration is the related loss. Lumps coated in lime before they finish reacting are carried out with the sludge and gasify in the pit, where the gas is both lost and a hazard. Large lumps at 20 % slurry solids coat readily; the data compiled by S. A. Miller (1965) show 50–80 mm carbide coating at every temperature up to 80 °C while 8–25 mm essentially never coats. Oversize carbide, poor agitation and thick sludge all push this up.
Check: generator temperature against its set point, water meter total against carbide weight for the week, agitator running its cycle, and the pit for continued bubbling after discharge.
4. Leaks
A leak takes gas between the generator and the cylinder and shows as a gap between generation and filling. Gasholder seals, hopper fill caps, screw-feed shaft seals, purifier lids and drier drain valves are the usual places; the troubleshooting register lists them by component.
Check: soap solution on every joint, never a flame. Repair only with the plant stopped and purged; a leak is never fixed while the plant is running.
5. A flooded or failing purifier
A purifier that is not drained of condensate from the bottom every shift floods, channels and restricts flow. Pressure builds upstream, relief valves lift, joints weep, and the compressor runs at low suction. The same flooding causes the bed to fail the silver nitrate test early. Falling yield and a failing purifier at the same time point here.
Check: purifier drain records, pressure drop across the bed, and the silver nitrate result at the outlet.
6. Generator faults
The generator itself loses gas when it vents: pressure above the working maximum after water was not added following a cold shutdown, a safety-valve vent lever left open, or a high-pressure switch set too low. It produces less than its carbide could give when it overheats and polymerises part of the acetylene, which shows as a tar smell and brownish-yellow residue and is covered under generator overheating. And it under-gasifies when the slurry is too thick: as compiled by S. A. Miller (1965), on poorer carbide of 250 l/kg the slurry reaches 21 % solids at a 6:1 ratio, past the 18 % fluidity limit, so with poor carbide the water ratio must rise.
Check: venting records, the temperature pattern on the tank, slurry consistency at the drain, and the hopper weights against the feed timer.
Measuring it properly
Yield per kg is only as good as the two numbers behind it. Carbide is weighed per hopper charge; gas is measured at the generator meter or inferred from cylinders filled by weight. A scale reading 2 % heavy hides a 2 % loss. Calibrate the carbide scale and the filling scales on a schedule, and record which carbide lot each charge came from so a fall can be traced to a delivery. IS 1040's gas-yield test on a sample of the lot, described under carbide quality tests, tells you what the carbide should have given; the shift log tells you what it did give. The difference is the plant's loss, and IS 8471 expects it to be no more than 10 %.
Rules that matter
Rules to apply
- Compute yield per kg every shift, by carbide lot, and trend it. See the shift log.
- When yield falls, check grade and storage first, sludge temperature second, leaks and purifier third, generator last.
- Open one drum at a time and charge it at once.
- Run the generator in the upper part of its permitted temperature band, never above the trip.
- Raise the water ratio when the carbide is poor or the slurry runs thick.
- Calibrate scales; an error in the weighing is an error in every number on the log.
The KIGL acetylene gas plant range is designed for continuous carbide-to-water feed of graded carbide (4–25 mm recommended on the 25 Nm³/h model, 4–50 mm on the larger models).
Why your acetylene yield per kg of carbide is falling — frequently asked questions
Why is my acetylene yield per kg of carbide low?
Check the carbide before the plant. A change from 25–50 mm to 4–7 mm carbide costs about 13 % on KIGL's schedule, and carbide that stood in an open drum for two days can lose 20–40 % of its gas. Only when grade and storage are ruled out should you look at sludge losses, leaks, a flooded purifier or the generator itself.
How much yield should I expect from carbide?
About 300 litres per kg for 25–50 mm lump of reference quality, falling to about 260 l/kg for 4–7 mm. IS 8471:2003 requires a generator to recover not less than 90 % of the carbide's yield rate. Compare like with like: check the reference temperature and pressure behind every yield figure before comparing a supplier's certificate with a published schedule.
Does generator temperature affect yield?
Yes, through the sludge. Acetylene dissolved in the outgoing slurry is about 1 % of the make at 60 °C but only 0.5–0.6 % at 75 °C. Running near the top of the permitted band, below the generator's high-temperature trip, recovers about half a per cent of output. Too hot is worse: an overheating generator polymerises part of the acetylene and loses it as tar.
How do I know if the yield loss is a leak?
Compare the gas made with the gas filled. A leak shows as a steady gap between the generator meter and the cylinders filled; locate it with soap solution, never a flame, and repair only with the plant stopped and purged. A sudden fall in yield with no change of carbide lot is more likely a leak or a fault than a storage loss.
Can fine carbide give the same yield as lump?
Not quite. Fine carbide has partly hydrated before it reaches the generator and may be coated with deposits that slow the first access of water. Carbide-to-water generators gasify it safely, but the yield per kg is lower: 248 l/kg for 1–2 mm against 300 for lump in BS 642:1931.
Why does yield fall when the purifier floods?
A purifier that is not drained of condensate every shift loses contact area, channels and backs up, restricting flow and forcing gas out through relief or leaking joints. The KIGL shift log records purifier state for this reason; flooding shows up as falling yield and a failing silver nitrate test at the same time.
References
- Bureau of Indian Standards. (1987). Calcium Carbide, Technical (IS 1040:1987, Third Revision). [withdrawn, superseded by IS 1040:2024 (1987 scan, Public Resource BIS mirror)]
- Bureau of Indian Standards. (2003). Acetylene Generators — Requirements (IS 8471:2003, First Revision).
- European Industrial Gases Association. (n.d.). Best Available Techniques for Acetylene Production (EIGA Doc 226). https://www.eiga.eu/uploads/documents/DOC226.pdf
- European Industrial Gases Association. (n.d.). Safe Operation of Acetylene Generator Systems (EIGA Doc 237).
Enquiries